Plant Room Fit-out Design
About This Project

An existing centralised boiler room serving a large accommodation block and administration facilities. The existing boilers, domestic hot water cylinders, and all associated pipework and equipment were stripped-out and existing distribution connections retained at the plant room boundary. Two new 400kW High water volume boilers were specified to avoid minimum flow issues, and installed with new circulation pumps and two 3,200 litre domestic hot water cylinders, all as co-ordinated in 3D by Sharman Grimwade Ltd, resulting in minimal site involvement due to robust and detailed proposals.

 